A B C D E F G H I J K L M N O P Q R S T U V W X Y Z
Pantograph Seal
Parallel Slide Valve
Parallel Tread
Peaking
PEEK (polyetheretherketone)
Performance Action Limit
Permit-To-Work(PTW)
PFD (average)
PFEER
Phishers
Physical Screen
Pipe Mill
Piping and Instrumentation Diagram
Pipe Support – Examples: Rigid Support, Rigid Hanger, Rod, Sliding, Foot, Pad, Anchor, Stanchion
Pipeline
Pipework
Planned Maintenance
Plant
Plant Operating Period
Plate Mill
Platform
Pontoon
Precision (ASTM E456)
Pressure Accessories (Art. 1, 2.1.4)
Pressure Casing
Pressure Equipment Directive
Pressure Equipment Regulation
Pressure System
Pressure Systems Safety Regulations
Pressure Test – Examples: Hydrostatic Test
Presumption of Conformity (Art. 5)
Preventive or Proactive Maintenance
Primary Barrier
Primary Containment Envelope
Primary Seal
Primary Structure
Primary Wind Girder
Prior use
Prioritisation
Probability of Failure
Probability of Failure on Demand (PFD)
Probe
Process Lag
Process Safety Time
Product
Product Process Plant
Programmable Electronic
Programmable Logic Controller
Prompt
Proof Pressure test
Proof Stress Designed Pressure Equipment
Proof Testing
Property
Protective Barrier
Protective Conductor
Protective Extra-Low Voltage (PELV)
Purchaser
Purchaser’s Inspection Engineer
PV Valve
Pantograph Seal
Parallel Slide Valve
Parallel Tread
Peaking
PEEK (polyetheretherketone)
Performance Action Limit
Permit-To-Work(PTW)
PFD (average)
PFEER
Phishers
Physical Screen
Pipe Mill
Piping and Instrumentation Diagram
Pipe Support – Examples: Rigid Support, Rigid Hanger, Rod, Sliding, Foot, Pad, Anchor, Stanchion
Pipeline
Pipework
Planned Maintenance
Plant
Plant Operating Period
Plate Mill
Platform
Pontoon
Precision (ASTM E456)
Pressure Accessories (Art. 1, 2.1.4)
Pressure Casing
Pressure Equipment Directive
Pressure Equipment Regulation
Pressure System
Pressure Systems Safety Regulations
Pressure Test – Examples: Hydrostatic Test
Presumption of Conformity (Art. 5)
Preventive or Proactive Maintenance
Primary Barrier
Primary Containment Envelope
Primary Seal
Primary Structure
Primary Wind Girder
Prior use
Prioritisation
Probability of Failure
Probability of Failure on Demand (PFD)
Probe
Process Lag
Process Safety Time
Product
Product Process Plant
Programmable Electronic
Programmable Logic Controller
Prompt
Proof Pressure test
Proof Stress Designed Pressure Equipment
Proof Testing
Property
Protective Barrier
Protective Conductor
Protective Extra-Low Voltage (PELV)
Purchaser
Purchaser’s Inspection Engineer
PV Valve